In this test the voids created between the trapezoidal deck profile and the upper flange of the beam were filled.
Divers injected grout into voids under the weir to stabilize it.
It is then assumed that the quantity of sand and cement should be equal to the voids.
Dispersion Stability Ensuring that the dispersion stability is controlled can prevent agglomeration leading to voids within the green body.
Selecting the Reduce menu option will then write a unique set of voids to the Shelx INS file as dummy atoms.